In Brief: The Project
The combined cycle power unit will have a generating capacity of 680.8 MW at 25°C and an efficiency of 54.6%.
The main equipment to be provided includes one M701JAC Mitsubishi gas turbine, one Hitachi steam turbine, one SPX-Air Cooled Condenser, one XIZI HRSG, besides balance of plant and other electrical/control equipment.
Future Benefits upon Commissioning
Financing
The Project was financed by ECA-covered facility from Sinosure China. The facility was made up of c. US$225 million China Export and Credit Insurance Corporation (“SINOSURE”) supported-facility with a 15-year tenor and a competitive interest rate wherein the principal amount will be repaid over a 15-year period including a 3-year grace period.
Project Management
SEPCOIII along with Mitsubishi Power are responsible to design, engineer, procure, construct and commission the Combined Cycle Gas Turbine Power Block comprising M701JAC gas turbine, an air-cooled version of J-series gas turbines and a steam turbine.
MJ701 GAS TURBINE
Executives inspect PS5 Block4 project